Challenge
The existing infrastructure had become outdated on two of the major living walls on campus, prompting the need for a comprehensive assessment and redesign. New Earth Solutions was tasked with the mission of removing the previous living walls, a process that required meticulous planning and execution. The tear-down process involved removing thousands of plants, power washing the eroding structure, and eliminating debris and build-up from the previous system. This phase of the project took one week per living wall, a testament to the intricacy of the task.